Projects
Completed
Kalisz, PL
2023
We have prepared machines for sea transport for one of our clients. The tasks included: - Production of boxes in accordance with IPPC/ISPM-15 standards - Packaging in accordance with the international HPE standard and secured with a special…
SeeCompleted
Czestochowa, PL
2023
Replacing the in-line calibrator Our own technical facilities - including a 35T electric Ormig crane, allow us to save time, making our work more efficient and faster.
SeeCompleted
Cracow-sieradz
2023
Relocation of the table with a diameter of 3.60 m We loaded the dismantled table with a diameter of 3.60 m in Krakow and, with the help of a remote control, quickly and safely transported to Sieradz.
SeeCompleted
Piotrków Trybunalski- Bardejov, PL-SVK
2023
Relocation of the production line Scope of work: - Electrical, hydraulic and mechanical disassembly - Loading and securing line elements - Transport Piotrkow Trybunalski - Bardejov - Unloading - Mechanical, hydraulic and…
SeeCompleted
Disassembly of the Muller 315T press
2023
Disassembly of the Müller 315T double-column press. The work also included securing the site for the time of disassembly and setting out an appropriate health and safety road so that it would not interfere with the further operation of the plant.
SeeCompleted
Hanower- Poland DE/PL
2023
Relocation of machinery and equipment from the plant in Germany to various locations, e.g. Poland, Germany and the Czech Republic.
SeeCompleted
Cracow, PL
2023
Carriage, unloading, transport to the hall and leveling of the YAMADA Press.
SeeCompleted
Limanowa, PL
2023
Preparation of the transport road and disassembly of the wall together with the structure. Moving the conveyor and reassembling it after transport
SeeCompleted
Stalowa Wola, PL
2022
Unloading and anchoring the Heller machine tool Scope of work: - unloading the machine tool outside the hall with the use of a crane and a forklift - transport on rollers to the destination place in the hall - anchoring the machine on the…
See